Overview
- Enhanced Hoist Operation Flexibility
- Combat Missions
- Disaster Relief
- Rapid Mounting
- Proven Performance
Quick Connect Mounting
- Three-day maximum for A-Kit mounting
- B-Kit mount time demonstrated at 20 minutes
- Maximum of two technicians required for B-kit
- Stowage case available


A-Kit Components (25 lbs.)
- Wiring Harness with clamps (12 lbs)
- Center Console Modification (3 lbs)
- Relay Panel Modification (2lbs)
- Hand Grip Assembly (8 lbs)
B-Kit Components (84 lbs.)
- Hoist Adapter (5 lbs)
- Hoist Arm (52 lbs)
- Hoist Support Frame Assembly (27 lbs)